Supreme Court, Appellate Division, Second Department, New York.
Jack J. CASTELLI, et al., Appellants,
v.
DEPARTMENT OF TRANSPORTATION OF the STATE OF NEW YORK, et al., Respondents.
July 16, 1990.
 Owners of real property abutting state highway sought judgment declaring their 
right to exclusive use and possession of strip of land along highway and 
permanent injunction prohibiting agents of state from entering upon their land.   
The Supreme Court, Dutchess County, Jiudice, J., denied plaintiffs' motion for 
summary judgment.   On appeal, the Supreme Court, Appellate Division, held that:  
(1) 1802 statute authorizing construction of highway in specified location and 
establishing public corporation to accomplish this directive the end and intent 
of which was to cause road "at least four rods wide" to be built, and related 
statutes, granted state easement for highway purposes with width of four rods;  
(2) original property owners would be presumed to have been compensated for 
taking;  and (3) easement was to be measured from original center line of road.
 Affirmed as modified and matter remitted.
West Headnotes
[1] Highways  47
200k47 Most Cited Cases
Statute passed in 1802 authorizing construction of highway in specified location 
and establishing public corporation to accomplish this directive with intent of 
that corporation being to cause road "at least four rods wide" to be laid out, 
along with related laws, created easement for highway purposes of width of four 
rods, not one merely limited to width of present paved portion of road.
[2] Eminent Domain  2(6)
148k2(6) Most Cited Cases
Original owners of property affected by four rod right-of-way in 1802 statute 
authorizing construction of road were presumably compensated for taking, in 
compliance with procedures outlined in statute.
[3] Highways  47
200k47 Most Cited Cases
State's easement for highway purposes would be measured from original center 
line of road.
 **941 Kirschenbaum & Kirschenbaum, P.C., Garden City (Samuel Kirschenbaum, of 
counsel), for appellants.
 **942 Robert Abrams, Atty. Gen., Albany (Peter J. Dooley and Dennis Hurley, of 
counsel), for respondents.
 Before *454 MANGANO, J.P., and THOMPSON, BRACKEN and RUBIN, JJ.
 MEMORANDUM BY THE COURT.
 *450 In an action pursuant to RPAPL article 15, inter alia, to determine the 
parties' claims to certain real property and for a permanent injunction, the 
plaintiffs appeal from so much of an order of the Supreme Court, Dutchess County 
(Jiudice, J.), entered September 29, 1988, as denied their motion for summary 
judgment.
 ORDERED that the order is modified, on the law, by deleting the provision 
thereof denying that branch of the defendants' cross motion which was for 
partial summary judgment on the issue of the existence of a highway easement 
over the subject real property in favor of the defendants and substituting 
therefor a provision granting that branch of the defendants' cross motion;  as 
so modified, the order is affirmed insofar as appealed from, without costs or 
disbursements, and the matter is remitted to the Supreme Court, Dutchess County, 
for a trial of the remaining issues and, thereafter, for the entry of an 
appropriate judgment, inter alia, declaring that the defendants have an easement 
for highway purposes with a width of four rods measured with reference to the 
center line of the Dutchess Turnpike.
 On April 5, 1802, the State Legislature passed a law authorizing the 
construction of a highway to run "from the courthouse, in the Village of 
Poughkeepsie" through various points *451 specified in the statute (L.1802, ch. 
CXI).   A public corporation, the "Dutchess Turnpike Company", was established 
in order to accomplish this directive, and the statute expressly made the 
officers of this corporation, and their successors, capable "of purchasing, 
holding and conveying any [real] estate * * * that they may deem necessary to 
enable them to fulfil the end and the intent of the corporation hereby created".   
The "end and the intent" of the Dutchess Turnpike Company, as set forth in the 
statute, was to "cause a road to be laid out to and from the places * * * 
mentioned [in the statute], at least four rods wide, except where valuable 
buildings interfere" (emphasis supplied).
 The present action was commenced after the plaintiffs, Jack and Margaret 
Castelli, the owners of certain real property which abuts the currently existing 
Dutchess Turnpike (also known as State Highway Route 44), unsuccessfully sought 
to prevent agents of the defendants, the New York State Department of 
Transportation (hereinafter the Department of Transportation) and the State of 
New York, from entering on their property as part of a project to expand the 
roadway.   In their complaint, the plaintiffs demanded judgment declaring their 
right to the exclusive use and possession of a strip of land along the Dutchess 
Turnpike.   According to the complaint, the defendants' agents had appropriated 
a portion of this land and were threatening to appropriate more.   The 
plaintiffs also sought a permanent injunction prohibiting the defendants' agents 
from entering upon their land.
 In support of their subsequent motion for summary judgment, the plaintiffs 
produced, among other things, a deed and the affidavit of a surveyor.   This 
evidence tended to prove that the plaintiffs had title to all the land up to the 
edge of the currently existing Dutchess Turnpike.   The plaintiff Jack Castelli 
stated that the defendants have nevertheless claimed the right to enter upon a 
strip of land "as much as 23 feet from the existing road".   It is the 
plaintiffs' position that the defendants have no rights with respect to this 
land.   In the words of an officer of the plaintiffs' title insurer, "the claim 
of the Department of Transportation is not supported by any filed or recorded 
instruments".   Also, the surveyor for the plaintiffs averred that no eminent 
domain proceeding had been instituted since the Dutchess Turnpike was last 
reconstructed, in 1932, so as to conform to its present dimensions.
 The defendants made a cross motion for summary judgment and for leave to amend 
their answer.   In his affidavit in support of **943 the cross motion, a 
surveyor for the Department of *452 Transportation did not take issue with the 
statements of fact upon which the plaintiffs' motion is based.   Instead, he 
argued what is essentially a point of law, i.e., that the statute referred to 
above (along with related laws subsequently passed by the Legislature on April 
10, 1813, and on February 23, 1916) mandated that the Dutchess Turnpike be at 
least four rods wide, so that by operation of law, the State had acquired an 
easement for highway purposes with at least those dimensions.   This surveyor's 
affidavit also served as the basis for the production of a document which 
contained a metes and bounds description of the centerline of the Dutchess 
Turnpike.   According to this surveyor, this document was sufficient to enable 
the defendants "to reestablish the centerline of the Dutchess Turnpike and also 
establish the highway boundaries which the State required in order to 
reconstruct the road".
 The attorney for the plaintiffs argued in a reply affidavit that "Chapter CXI 
of the Laws of 1802 was merely an enabling statute creating a corporation with 
the authority to acquire lands for the purpose of constructing a road.   The 
statute is not a document which conveyed to, or granted an easement to, the 
Turnpike Company or its successors".   He further argued that section VIII of 
Chapter CXI created a mechanism by which the Dutchess Turnpike Company could 
legally take property from the landowners whose property lay in the path of the 
proposed highway, and that this statutory mechanism has since been superseded by 
the terms of the Eminent Domain Procedure Law.
 The Supreme Court denied both the plaintiffs' motion for summary judgment and 
that branch of the defendants' cross motion which was for summary judgment. That 
branch of the cross motion which was for the alternative relief of leave to 
amend the answer was apparently not decided, and is not under review on this 
appeal.   The plaintiffs have appealed from so much of the order as denied their 
motion;  however, we may search the record in order to determine whether either 
party is entitled to summary judgment (see, CPLR 3212[b] ).  Upon our review, we 
find that defendants are entitled to partial summary judgment declaring the 
existence of a right of way with a width of four rods.
 [1] The central question in this case is whether the defendants' easement for 
highway purposes is limited to the width of the present paved portion of 
Dutchess Turnpike, as argued by the plaintiffs, or whether, instead, the 
statutes referred to above effectively granted the defendants an easement for 
highway purposes with a width of four rods.   The plaintiffs argue that *453 the 
statutes referred to above did not themselves accomplish the acquisition of the 
four-rod width of land needed for the Dutchess Turnpike as it was originally 
conceived, but instead merely created a public agency with the power to bring 
the condemnation proceedings necessary in order to make such acquisitions.   The 
plaintiffs argue that, in the absence of proof that such condemnation 
proceedings were brought, it must be presumed that the Dutchess Turnpike Company 
(and its successors) never took the steps needed to fulfill the statutory 
mandate.
 Whatever persuasiveness the plaintiffs' argument might seem to have, the fact 
remains that it is no longer tenable in light of the decision of the Court of 
Appeals in Schillawski v. State of New York, 9 N.Y.2d 235, 213 N.Y.S.2d 68, 173 
N.E.2d 793).   In Schillawski, the court held that the State had acquired an 
easement with a width of six rods by virtue of a statute (L.1800, ch. 78) which 
authorized the Seneca Road Company to build the Seneca Turnpike, and which 
provided that the Seneca Turnpike should be six rods in width.   Over the 
dissent of Judge Froessel, who noted that the statute in question "did not give 
the company a [six rod] right of way, but simply authorized it to lay out a road 
that width" (Schillawski v. State of New York, supra, at 241, 213 N.Y.S.2d 68, 
173 N.E.2d 793) and who also noted that there was "no evidence whatever that the 
company had purchased or condemned land" (Schillawski v. State of New York, 
supra, at 240, 213 N.Y.S.2d 68, 173 N.E.2d 793) the majority **944 of the Court 
of Appeals held that an easement of six rods had been created solely as a result 
of the enactment of the statute.   The court also held that the State had not 
abandoned this easement (see, Highway Law §  205[1];  Beckwith v. Whalen, 65 
N.Y. 322, Matter of Flacke v. Strack, 98 A.D.2d 881, 882, 470 N.Y.S.2d 863).   
There is no proof of an abandonment within the meaning of Highway Law §  205(1), 
in this case.
 [2] The arguments made by the plaintiffs in this case mirror precisely the 
arguments which, as reflected in Judge Froessel's dissent, were rejected by the 
Court of Appeals in the Schillawski case.   The plaintiffs argue that the State 
must prove that the turnpike Company compensated the original owners of the 
property affected by the four rod right of way;  however, pursuant to the 
holding of the Schillawski case, such compensation is presumed to have been made 
since it is presumed that there was compliance with the procedures outlined in 
the governing statute (see also, Lashway v. State of New York, 39 A.D.2d 966, 
333 N.Y.S.2d 604;  Bovee v. State of New York, 28 A.D.2d 1165, 284 N.Y.S.2d 566;  
Hering v. Town of Canandaigua, 52 Misc.2d 98, 275 N.Y.S.2d 56).   It is, in 
effect, presumed that the plaintiffs' predecessors in title were compensated for 
the *454 taking of the four-rod strip of land which, as reflected in the 
statutes mentioned above, was intended by the Legislature to serve as the 
roadbed for the Dutchess Turnpike.
 [3] In accordance with this rule of law, the defendants are entitled to partial 
summary judgment declaring that they are the owners of an easement for highway 
purposes with a width of four rods, the central point of reference being the 
centerline of the road as set forth in the original survey of the Turnpike.   
However, the various papers submitted in connection with the parties' motion and 
cross motion do not permit us either to confirm that the defendant has been 
able, as it is claimed, to "reestablish the centerline of Dutchess Turnpike", or 
to define precisely where that line is.   We note, incidentally, that it is not 
necessary for the State to prove that the centerline of the existing Turnpike 
coincides exactly with the centerline as originally laid out (see, Lashway v. 
State of New York, supra, at 996-997, 333 N.Y.S.2d 604).   It is sufficient to 
say that the State has an easement for highway purposes extending two rods to 
either side of the original centerline. On this record we are unable to 
determine the precise boundaries of the easement or whether the defendants have 
trespassed beyond those boundaries (cf., Frankfater v. State of New York, 17 
A.D.2d 515, 517-518, 235 N.Y.S.2d 476).
 Accordingly, we grant partial summary judgment to the defendants declaring that 
the State has a four-rod easement measured from the original centerline of the 
Dutchess Turnpike, and we remit the matter for a trial at which the defendants 
must prove the location of the original centerline and must establish that the 
portion of the plaintiffs' land which they intend to improve for highway 
purposes falls within the original bounds of the easement. If it appears that 
the defendants are making no threat to exceed the boundaries of this easement, 
then the plaintiffs' causes of action would be dismissed.
557 N.Y.S.2d 941, 163 A.D.2d 450
END OF DOCUMENT
Supreme Court, Appellate Division, Second Department, New York.
Jack J. CASTELLI, et al., Appellants,v.DEPARTMENT OF TRANSPORTATION OF the STATE OF NEW YORK, et al., Respondents.

July 16, 1990.

 Owners of real property abutting state highway sought judgment declaring their right to exclusive use and possession of strip of land along highway and permanent injunction prohibiting agents of state from entering upon their land.   The Supreme Court, Dutchess County, Jiudice, J., denied plaintiffs' motion for summary judgment.   On appeal, the Supreme Court, Appellate Division, held that:  (1) 1802 statute authorizing construction of highway in specified location and establishing public corporation to accomplish this directive the end and intent of which was to cause road "at least four rods wide" to be built, and related statutes, granted state easement for highway purposes with width of four rods;  (2) original property owners would be presumed to have been compensated for taking;  and (3) easement was to be measured from original center line of road.
 Affirmed as modified and matter remitted.

West Headnotes
[1] Highways  47200k47 Most Cited Cases
Statute passed in 1802 authorizing construction of highway in specified location and establishing public corporation to accomplish this directive with intent of that corporation being to cause road "at least four rods wide" to be laid out, along with related laws, created easement for highway purposes of width of four rods, not one merely limited to width of present paved portion of road.
[2] Eminent Domain  2(6)148k2(6) Most Cited Cases
Original owners of property affected by four rod right-of-way in 1802 statute authorizing construction of road were presumably compensated for taking, in compliance with procedures outlined in statute.
[3] Highways  47200k47 Most Cited Cases
State's easement for highway purposes would be measured from original center line of road. **941 Kirschenbaum & Kirschenbaum, P.C., Garden City (Samuel Kirschenbaum, of counsel), for appellants.
 **942 Robert Abrams, Atty. Gen., Albany (Peter J. Dooley and Dennis Hurley, of counsel), for respondents.

 Before *454 MANGANO, J.P., and THOMPSON, BRACKEN and RUBIN, JJ.


 MEMORANDUM BY THE COURT.
 *450 In an action pursuant to RPAPL article 15, inter alia, to determine the parties' claims to certain real property and for a permanent injunction, the plaintiffs appeal from so much of an order of the Supreme Court, Dutchess County (Jiudice, J.), entered September 29, 1988, as denied their motion for summary judgment.
 ORDERED that the order is modified, on the law, by deleting the provision thereof denying that branch of the defendants' cross motion which was for partial summary judgment on the issue of the existence of a highway easement over the subject real property in favor of the defendants and substituting therefor a provision granting that branch of the defendants' cross motion;  as so modified, the order is affirmed insofar as appealed from, without costs or disbursements, and the matter is remitted to the Supreme Court, Dutchess County, for a trial of the remaining issues and, thereafter, for the entry of an appropriate judgment, inter alia, declaring that the defendants have an easement for highway purposes with a width of four rods measured with reference to the center line of the Dutchess Turnpike.
 On April 5, 1802, the State Legislature passed a law authorizing the construction of a highway to run "from the courthouse, in the Village of Poughkeepsie" through various points *451 specified in the statute (L.1802, ch. CXI).   A public corporation, the "Dutchess Turnpike Company", was established in order to accomplish this directive, and the statute expressly made the officers of this corporation, and their successors, capable "of purchasing, holding and conveying any [real] estate * * * that they may deem necessary to enable them to fulfil the end and the intent of the corporation hereby created".   The "end and the intent" of the Dutchess Turnpike Company, as set forth in the statute, was to "cause a road to be laid out to and from the places * * * mentioned [in the statute], at least four rods wide, except where valuable buildings interfere" (emphasis supplied).
 The present action was commenced after the plaintiffs, Jack and Margaret Castelli, the owners of certain real property which abuts the currently existing Dutchess Turnpike (also known as State Highway Route 44), unsuccessfully sought to prevent agents of the defendants, the New York State Department of Transportation (hereinafter the Department of Transportation) and the State of New York, from entering on their property as part of a project to expand the roadway.   In their complaint, the plaintiffs demanded judgment declaring their right to the exclusive use and possession of a strip of land along the Dutchess Turnpike.   According to the complaint, the defendants' agents had appropriated a portion of this land and were threatening to appropriate more.   The plaintiffs also sought a permanent injunction prohibiting the defendants' agents from entering upon their land.
 In support of their subsequent motion for summary judgment, the plaintiffs produced, among other things, a deed and the affidavit of a surveyor.   This evidence tended to prove that the plaintiffs had title to all the land up to the edge of the currently existing Dutchess Turnpike.   The plaintiff Jack Castelli stated that the defendants have nevertheless claimed the right to enter upon a strip of land "as much as 23 feet from the existing road".   It is the plaintiffs' position that the defendants have no rights with respect to this land.   In the words of an officer of the plaintiffs' title insurer, "the claim of the Department of Transportation is not supported by any filed or recorded instruments".   Also, the surveyor for the plaintiffs averred that no eminent domain proceeding had been instituted since the Dutchess Turnpike was last reconstructed, in 1932, so as to conform to its present dimensions.
 The defendants made a cross motion for summary judgment and for leave to amend their answer.   In his affidavit in support of **943 the cross motion, a surveyor for the Department of *452 Transportation did not take issue with the statements of fact upon which the plaintiffs' motion is based.   Instead, he argued what is essentially a point of law, i.e., that the statute referred to above (along with related laws subsequently passed by the Legislature on April 10, 1813, and on February 23, 1916) mandated that the Dutchess Turnpike be at least four rods wide, so that by operation of law, the State had acquired an easement for highway purposes with at least those dimensions.   This surveyor's affidavit also served as the basis for the production of a document which contained a metes and bounds description of the centerline of the Dutchess Turnpike.   According to this surveyor, this document was sufficient to enable the defendants "to reestablish the centerline of the Dutchess Turnpike and also establish the highway boundaries which the State required in order to reconstruct the road".
 The attorney for the plaintiffs argued in a reply affidavit that "Chapter CXI of the Laws of 1802 was merely an enabling statute creating a corporation with the authority to acquire lands for the purpose of constructing a road.   The statute is not a document which conveyed to, or granted an easement to, the Turnpike Company or its successors".   He further argued that section VIII of Chapter CXI created a mechanism by which the Dutchess Turnpike Company could legally take property from the landowners whose property lay in the path of the proposed highway, and that this statutory mechanism has since been superseded by the terms of the Eminent Domain Procedure Law.
 The Supreme Court denied both the plaintiffs' motion for summary judgment and that branch of the defendants' cross motion which was for summary judgment. That branch of the cross motion which was for the alternative relief of leave to amend the answer was apparently not decided, and is not under review on this appeal.   The plaintiffs have appealed from so much of the order as denied their motion;  however, we may search the record in order to determine whether either party is entitled to summary judgment (see, CPLR 3212[b] ).  Upon our review, we find that defendants are entitled to partial summary judgment declaring the existence of a right of way with a width of four rods.
 [1] The central question in this case is whether the defendants' easement for highway purposes is limited to the width of the present paved portion of Dutchess Turnpike, as argued by the plaintiffs, or whether, instead, the statutes referred to above effectively granted the defendants an easement for highway purposes with a width of four rods.   The plaintiffs argue that *453 the statutes referred to above did not themselves accomplish the acquisition of the four-rod width of land needed for the Dutchess Turnpike as it was originally conceived, but instead merely created a public agency with the power to bring the condemnation proceedings necessary in order to make such acquisitions.   The plaintiffs argue that, in the absence of proof that such condemnation proceedings were brought, it must be presumed that the Dutchess Turnpike Company (and its successors) never took the steps needed to fulfill the statutory mandate.
 Whatever persuasiveness the plaintiffs' argument might seem to have, the fact remains that it is no longer tenable in light of the decision of the Court of Appeals in Schillawski v. State of New York, 9 N.Y.2d 235, 213 N.Y.S.2d 68, 173 N.E.2d 793).   In Schillawski, the court held that the State had acquired an easement with a width of six rods by virtue of a statute (L.1800, ch. 78) which authorized the Seneca Road Company to build the Seneca Turnpike, and which provided that the Seneca Turnpike should be six rods in width.   Over the dissent of Judge Froessel, who noted that the statute in question "did not give the company a [six rod] right of way, but simply authorized it to lay out a road that width" (Schillawski v. State of New York, supra, at 241, 213 N.Y.S.2d 68, 173 N.E.2d 793) and who also noted that there was "no evidence whatever that the company had purchased or condemned land" (Schillawski v. State of New York, supra, at 240, 213 N.Y.S.2d 68, 173 N.E.2d 793) the majority **944 of the Court of Appeals held that an easement of six rods had been created solely as a result of the enactment of the statute.   The court also held that the State had not abandoned this easement (see, Highway Law §  205[1];  Beckwith v. Whalen, 65 N.Y. 322, Matter of Flacke v. Strack, 98 A.D.2d 881, 882, 470 N.Y.S.2d 863).   There is no proof of an abandonment within the meaning of Highway Law §  205(1), in this case.
 [2] The arguments made by the plaintiffs in this case mirror precisely the arguments which, as reflected in Judge Froessel's dissent, were rejected by the Court of Appeals in the Schillawski case.   The plaintiffs argue that the State must prove that the turnpike Company compensated the original owners of the property affected by the four rod right of way;  however, pursuant to the holding of the Schillawski case, such compensation is presumed to have been made since it is presumed that there was compliance with the procedures outlined in the governing statute (see also, Lashway v. State of New York, 39 A.D.2d 966, 333 N.Y.S.2d 604;  Bovee v. State of New York, 28 A.D.2d 1165, 284 N.Y.S.2d 566;  Hering v. Town of Canandaigua, 52 Misc.2d 98, 275 N.Y.S.2d 56).   It is, in effect, presumed that the plaintiffs' predecessors in title were compensated for the *454 taking of the four-rod strip of land which, as reflected in the statutes mentioned above, was intended by the Legislature to serve as the roadbed for the Dutchess Turnpike.
 [3] In accordance with this rule of law, the defendants are entitled to partial summary judgment declaring that they are the owners of an easement for highway purposes with a width of four rods, the central point of reference being the centerline of the road as set forth in the original survey of the Turnpike.   However, the various papers submitted in connection with the parties' motion and cross motion do not permit us either to confirm that the defendant has been able, as it is claimed, to "reestablish the centerline of Dutchess Turnpike", or to define precisely where that line is.   We note, incidentally, that it is not necessary for the State to prove that the centerline of the existing Turnpike coincides exactly with the centerline as originally laid out (see, Lashway v. State of New York, supra, at 996-997, 333 N.Y.S.2d 604).   It is sufficient to say that the State has an easement for highway purposes extending two rods to either side of the original centerline. On this record we are unable to determine the precise boundaries of the easement or whether the defendants have trespassed beyond those boundaries (cf., Frankfater v. State of New York, 17 A.D.2d 515, 517-518, 235 N.Y.S.2d 476).
 Accordingly, we grant partial summary judgment to the defendants declaring that the State has a four-rod easement measured from the original centerline of the Dutchess Turnpike, and we remit the matter for a trial at which the defendants must prove the location of the original centerline and must establish that the portion of the plaintiffs' land which they intend to improve for highway purposes falls within the original bounds of the easement. If it appears that the defendants are making no threat to exceed the boundaries of this easement, then the plaintiffs' causes of action would be dismissed.
557 N.Y.S.2d 941, 163 A.D.2d 450
END OF DOCUMENT